摘要
针对矩形顶管隧道施工引起的地面变形问题,分析了地面变形的破坏形式,并着重研究了施工引起地面变形的控制措施,研究结果可为同类工程的施工提供依据。
Aiming at the problem of ground deformation caused by rectangular jacking tunnel construction,the damage form of ground deformation is analyzed,and the control measures of ground deformation caused by construction are studied. The research results can provide basis for the construction of similar projects.
引文
[1]张振.超大矩形断面顶管隧洞开挖引起的地表沉降研究[D].郑州:华北水利水电大学,2016.
[2]刘平,戴燕超.矩形顶管机的研究和设计[J].市政技术,2005(2):92-95,101.
[3]李宏峰,刘欢欢,鲍先凯.浅析顶管施工引起的地面变形[J].土工基础,2015,29(5):50-52.
[4]余剑锋.顶管施工引起地表变形问题研究[D].广州:广州大学,2006.