工业EPC项目常见结算争议及注意事项
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Attentions of common settlement disputes for industrial EPC projects
  • 作者:郭晓燕 ; 毛兴 ; 王俊林 ; 雷祥
  • 英文作者:Guo Xiaoyan;Mao Xing;Wang Junlin;Lei Xiang;Qinghai Salt Lake Industry Co., Ltd.;
  • 关键词:工业EPC项目 ; 结算争议 ; 工业项目
  • 英文关键词:Industrial EPC project;;Settlement disputes;;The points of note
  • 中文刊名:GCZJ
  • 英文刊名:Engineering Cost Management
  • 机构:青海盐湖工业股份有限公司;
  • 出版日期:2019-06-10
  • 出版单位:工程造价管理
  • 年:2019
  • 期:No.167
  • 语种:中文;
  • 页:GCZJ201903013
  • 页数:6
  • CN:03
  • ISSN:11-3151/TB
  • 分类号:80-85
摘要
EPC总承包模式近年来在石化、铁路、电力等行业相关工程实施中备受业主青睐,工业项目因其工程费用投资大、工艺复杂、技术先进、设计质量要求高、釜塔器等超常规设备多,且涉及专业领域广(一般包含火电、电力、化工、冶炼、机电安装、市政、环保等领域),为了便于专业化管理,对技术成熟的工业项目基本均采用EPC总承包模式。随着EPC工程承包模式的广泛采用,其在工程结算中存在的争议问题也逐渐浮现出来。通过对青海盐湖金属镁一体化工业园建设中存在的EPC总承包项目结算争议问题进行分析,结合一些典型争议问题的实际处理方式,并从法理角度进行必要说明,进而提出在招标投标合同签订阶段、工程建设阶段、工程结算阶段避免结算争议的注意事项,可为EPC项目各参建方规避结算中出现较大争议提供一定参考。
        The EPC general contracting model has been favored by owners in the implementation of projects related to petrochemical,railway, and electric power industries in recent years. Industrial projects always with the large investment, complicated processes, advanced technology, high designing quality requirements, and a large number of ultra-conventional equipments, such as Reaction Cauldrons,Towers. Which also involves a wide range of professional fields(generally including thermal power, electricity, chemicals,smelting, electromechanical installation, municipal administration, environmental protection, etc.), In order to facilitate professional management, EPC general contracting model is basically used in industrial projects of mature technology.With the widespread adoption of the EPC model, the controversial issues in project settlement have gradually emerged. Through the analysis of the settlement disputes of EPC contracting projects in the construction of Qinghai Salt Lake Metal Magnesium Integrated Industrial Park, combining with the actual treatment of some typical dispute issues, and providing some necessary explanations from the legal point of view.Eventually, the points of note for avoiding settlement disputes are put forward during the signing stage, construction stage and settlement stage, which can provide some reference for EPC project participants to avoid major disputes in settlement.
引文
[1]李明,金宇澄.EPC总承包模式的造价管理[J].国际经济合作,2006(02):39-42.
    [2]王丽萍.EPC总承包项目设计阶段的工程造价控制[J].煤炭技术,2013(03):138-139.
    [3]毛兴,郭晓燕.10万t/a电解镁装置电解槽施工技术[J].石油化工建设,2018(03):61-66.
    [4]刘伊生.建设工程造价管理[M].北京:中国计划出版社,2017.
    [5]建设工程工程量清单计价规范[S].2013.
    [6]柯洪.建设工程计价[M].北京:中国计划出版社,2017.
    [7]张建波.EPC项目造价管理[M].西安:西安交通大学出版社,2018.
    [8]中华人民共和国招标投标法[S].
    [9]最高人民法院建设工程施工合同司法解释理解与适用[S].2015.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700