摘要
分析研究TBM施工隧洞常见的地质灾害类型、中超前地质预报方法及其不同超前地质预报方法的原理、适用范围、优点及不足不处,针对不同类型的地质灾害提出了防治措施。
The common types of geological disasters were analyzed,including surrouding rock collapse at fault fracture zone,large deformation of soft rock,rock burst,water gushing,karst,high heat and harmful gases.Then,the geological prediction methods in TBM construction were studied which could be divided to direct and indirect methods.The principle,scope,application scope,advantages and disadvantages of differents methods were analyzed.Finally,the prevention measures to different type of geological disasters were proposed.
引文
[1]张镜剑,傅冰骏.隧道掘进机在我国应用的进展[J].岩石力学与工程学报,2007,26(2):226-238.
[2]张镜剑.TBM的应用及其有关问题和展望[J].岩石力学与工程学报,1999,18(3):363-367.
[3]尹俊涛,尚彦军,傅冰骏,等.TBM掘进技术发展及有关工程地质问题分析和对策[J].工程地质学报,2005,13(3):389-397.
[4]茅承觉.我国全断面岩石掘进机(TBM)发展的回顾与思考[J].建设机械技术与管理,2008,21(5):81-84.
[5]尚彦军,杨志法,曾庆利,等.TBM遇险工程地质问题分析和失误的反思[J].岩石力学与工程学报,2007,27(12):2404-2411.
[6]罗志虎,杨鹏飞.锦屏二级水电TBM施工中的岩爆问题分析及对策[J].岩土工程技术,2009,23(1):52-55.
[7]车晓明.TBM施工中主要地质灾害及相关勘察工作认识[J].铁道勘察,2009(3):38-40.
[8]刘波.全断面双护盾掘进在引黄工程断层破碎带的卡机处理[J].山西水利科技,2007(2):13-14.
[9]袁亮,石钊.锦屏二级水电站引水隧洞TBM遇突涌水施工对策[J].水电站设计,2012(增刊):9-11.
[10]张许平.深埋水电隧道TBM施工中的软岩变形分析[J].电力学报,2005,20(1):50-52.
[11]朱玉江.极强岩爆条件下开敞式TBM施工措施探讨与应用[J].国防交通工程与技术,2012(6):71-74.
[12]王森昌.锦屏引水洞高地应力地质条件下TBM施工对策[J].铁道建筑技术,2011(4):28-33.
[13]袁亮,彭邦兴.锦屏二级水电站引水隧洞岩爆段TBM穿越技术[J].水电站设计,2012(增刊):13-17.
[14]尹俊涛,尚彦军,傅冰骏,等.TBM掘进技术发展及有关工程地质问题分析和对策[J].工程地质学报,2005,13(3):389-397.
[15]刘跃丽,郭峰,田满义.双护盾TBM开挖隧道围岩类型判别[J].同煤科技,2003(1):27-28.
[16]程怀舟.基于钻机的TBM隧洞施工超前地质预报系统开发研究[D].武汉:武汉大学,2005.
[17]和万春.快速钻机在隧洞施工地质预报中的应用研究[J].铁道建筑技术,2010(2):9-13.
[18]高振宅.Beam地质超前预报系统在锦屏引水隧洞TBM施工中的应用[J].铁道建筑技术,2009(11):65-67.
[19]朱劲,李天斌,李永林,等.Beam超前地质预报技术在铜锣山隧道中的应用[J].工程地质学报,2007,15(2):258-262.
[20]周波,范洪海.基于HSP声波反射法的隧道超前地质预报[J].现代隧洞技术,2011,48(1):133-136.
[21]夏赞鸥,高波,李苍松.HSP声波反射应用于五龙山隧道超前地质预报[J].西部探矿工程,2008,20(3):144-146.
[22]李盼,黄仁东,杨光,等.地质雷达在隧道施工超前地质预报中的应用[J].西部探矿工程,2011(4):140-143.
[23]崔芳,高永涛,吴顺川.基于地质雷达的隧道掌子面前方地质预报研究[J].中国矿业,2011,20(3):115-118.