摘要
以福州某商业广场工程为工程背景,在正交各向异性GFRP层合板设计中提出一种各向异性GFRP层合板的简化计算方法,大大提高计算效率。对该项目采用BIM技术进行全过程管理,设计并开发对应的数据框架,大大提高管理与施工效率。从安装连接、主钢架安装、檩条安装、GFRP面板安装方面介绍施工过程。
Based on a commercial plaza project in Fuzhou,a simplified calculation method of anisotropic GFRP laminates is proposed in the design of orthotropic GFRP laminates,which greatly improves the calculation efficiency. BIM technology is used to manage the whole process of the project,and the corresponding data framework is designed and developed,which greatly improves the efficiency of management and construction. The construction process is introduced from the aspects of installation connection,main steel frame installation,purlin installation and GFRP panel installation.
引文
[1]扎哈·哈迪德,帕特里克·舒马赫,任虎.转喻的景观韩国东大门设计广场[J].室内设计与装修,2015(2):64-69.
[2]Mad建筑设计事务所.梦露大厦2006-2011[J].时代建筑,2010(1):66-71.
[3]徐永选,翁邦正,李俊成,等.重庆万达城展示中心异形多曲面幕墙外观质量控制技术[J].施工技术,2018,47(11):10-12,58.
[4]江筠,黄昕,段伟,等.天河机场交通中心双曲面金属吊顶施工技术[J].施工技术,2018,47(5):6-10.
[5]MEIKLE J L.American plastic:a cultural history[M].Rutgers University Press,1995.
[6]TAANILA M.Futuro-Tomorrow's House from Yesterday[M].Desura,2004.
[7]Octatube.Yitzhak Rabin Center[EB/OL].https://www.octatube.nl/en_GB/project-item.html/projectitem/18.
[8]HADID Z.Mobile Art Chanel Contemporary Art Container[Z].The UK:Zaha Hadid Architects,2010.