三榀菱形挂篮在宽幅箱梁悬浇过程中力学特性研究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:The Mechanical Properties Study on Three Pieces Movable Suspended Scaffolding in Cantilever Pouring Construction Process of Wide Box Girder
  • 作者:张洪斌 ; 雷赟 ; 马敏 ; 谭潇 ; 齐海鹏 ; 任翔
  • 英文作者:ZHANG Hongbin;LEI Yun;MA Min;TAN Xiao;QI Haipeng;REN Xiang;The Fifth Engineering Co.,Ltd.of China Communications Railway Engineering Bureau;College of Architecture and Civil Engineering,Xi'an University of Science and Technology;
  • 关键词:桥梁工程 ; 刚构桥 ; 悬臂浇筑 ; 挂篮 ; 传感器 ; 应力测试
  • 英文关键词:bridges;;rigid frame bridges;;cantilever pouring;;suspended scaffolding;;sensors;;stress testing
  • 中文刊名:SGJS
  • 英文刊名:Construction Technology
  • 机构:中铁建大桥工程局集团第五工程有限公司;西安科技大学建筑与土木工程学院;
  • 出版日期:2017-09-10
  • 出版单位:施工技术
  • 年:2017
  • 期:v.46;No.492
  • 基金:中国铁建大桥工程局集团有限公司科研资助项目(Cr13gk-2013-19;Cr13gk5-2013-3);; 国家自然科学青年基金项目(51408484);; 陕西省教育厅科研计划资助项目(14JK1488)
  • 语种:中文;
  • 页:SGJS201717008
  • 页数:4
  • CN:17
  • ISSN:11-2831/TU
  • 分类号:42-45
摘要
为了探明挂篮在混凝土梁段浇筑过程各杆件的受力状况,依托某铁路连续刚构桥对3榀菱形挂篮在混凝土梁段浇筑过程中的受力特性进行了理论与试验测试研究。结果表明,部分杆件在顶板混凝土浇筑后应力有所下降,多数杆件在整个梁段浇筑过程中应力变化不明显。这说明在浇筑顶板混凝土时,底板和腹板混凝土自身已具备一定强度,分担挂篮承受的部分荷载。挂篮杆件理论计算应力和实际测试应力远远小于材料的允许应力,挂篮的强度设计偏于保守,优化设计空间较大。建议在保证挂篮整体稳定性的前提下,挂篮设计应该轻型化。
        In order to studying the stress condition of the truss of Movable suspended scaffolding in the concrete pouring process,the mechanical properties of the truss were studied by the finite element software and tested in the construction process of girder pieces concrete relying on a railway bridge beam.The results showed that the stress from part of the links of the truss decreased after concrete pouring of the girder roof,and most links stress change is not obvious. When the girder roof concrete pouring finished,the girder floor and the web concrete itself had has some strength to share partial load for movable suspended scaffolding. Meanwhile,theoretical calculation of the stress and testing stress of the links of movable suspended scaffolding is far less than the link material allowed stress,the strength design of the movable suspended scaffolding is enough safety, which optimization design space is larger. It is suggestion that movable suspended scaffolding should be light-duty design based on the overall stability under the premise of guarantee.
引文
[1]吴为东.杭州下沙大桥七、八合同段主桥主梁施工挂篮型式的比较与分析[J].桥梁建设,2003(6):71-73.
    [2]谢理民.宽幅斜拉桥牵索挂篮静载试验有限元分析[J].世界桥梁,2013,41(2):27-30.
    [3]曾杰.岳阳洞庭湖大桥主梁挂篮设计及施工验算[J].中外公路,2005(2):93-95.
    [4]刘维华,王景春,王宁.基于模糊层次综合评价法的挂篮施工安全评价[J].铁道建筑,2012(10):19-21.
    [5]刘志峰,陈庆华.多塔长联矮塔斜拉桥超宽幅挂篮安全性测试方法研究[J].施工技术,2012,41(23):23-25,31.
    [6]张建国.陈村特大桥主桥500t宽幅挂篮优化设计[J].世界桥梁,2014,42(4):35-38.
    [7]陈国梁.三角挂篮主桁架应力和变形计算与实际差别[J].铁道建筑技术,2009(5):39-42.