以芭蕉坪大桥工程为例,针对连续梁施工过程中出现的块件接头错台、混凝土部分浇注后形成施工缝、预应力张拉伸长量不足等问题分别提出了具体的解决措施,最终提高了连续梁桥的外观和工程质量。
Taking Bajiaoping Bridge Project as an example, concrete measures are proposed to solve the problems such as block joint faulting, construction joint formed after partial casting of concrete, and insufficient prestressed tensile length in the construction of continuous beam, so as to improve the appearance and engineering quality of continuous beam bridge.
引文
[1]付路宾.预应力砼连续梁桥施工质量控制要点[J].中国高新技术企业,2007(2):97-98.
[2]任利锋,郑华.现浇预应力砼连续箱梁施工质量控制要点研究[J].甘肃科技,2014(9):97-98.
[3]任文斌.铁路大跨度连续梁结构施工工艺和质量控制要点[J].化工管理,2015(5):97.