摘要
采用传统的油田新井产能建设会造成原油生产的减小,为了解决该问题,本文提出了提升油田新井产能建设时效的具体办法,在实际应用中取得了较好的效果。
The use of traditional oilfield new well capacity construction will lead to a reduction in crude oil production. In order to solve this problem, this paper proposes a specific method to improve the timeliness of new oilfield production capacity construction, and achieved good results in practical applications.
引文
[1]党俊.油田新建区块产能建设项目综合后评价研究[D].西安石油大学,2013.
[2]李慧娟.油田产能建设项目综合后评价指标体系与方法[J].统计与决策,2012(20):69-71.