摘要
文章从"崇明台新井水位处理系统"程序的设计目的、思路、软件功能、系统布设、程序界面、程序应用方面进行详细论述。程序运行结果表明,该程序在日常水位台阶处理应用中较为适用,能有效解决水位干扰台阶导致日变幅较大的问题,同时能够显示水位的正常日变,为前兆数据准确分析提供条件。
This paper discusses in detail the design purpose and thinking of the program of " Chongming Station New Well Water Level Processing System",the design of software function,system design,program interface design and the analysis of program application results.The operation results show that the program is more applicable in the daily water-level step processing,and can effectively solve the problem of large daily variations caused by water-level disturbance step.At the same time,it can show the normal daily variations of water level,which provides conditions for accurate data analysis.