摘要
那棱格勒河水利枢纽是那棱格勒河干流唯一的一座大型综合性控制工程,具有防洪、供水、兼顾发电等综合利用功能。应用动态分析法对枢纽工程效益费用逐一进行了分析与计算,并对枢纽工程整体进行了国民经济评价和敏感性分析,得出那棱格勒河水利枢纽经济上合理、抗风险能力强和社会效益显著的结论。
The Nalenggele River Water Control Project is the only large-scale comprehensive control project in the main stream of the Nalenggele River. It has the functions of flood control, water supply, and comprehensive utilization of power generation. Dynamic analysis method is used to analyze and calculate the cost of the project benefit one by one, and the national economy evaluation and sensitivity analysis of the project as a whole, the conclusion that the water Conservancy Project of Nalenggele River is economically reasonable, has obtained. strong risk resistance and has significant social benefits.
引文
[1] 刘宗仁,董昊雯. 青海省海西州那棱格勒河水利枢纽工程初步设计报告[R].郑州:黄河勘测规划设计有限公司,2018.
[2] 国家发改委,建设部.建设项目经济评价方法与参数[M]. 3版. 北京:中国计划出版社,2006:213-216.
[3] 董芸.我国水电投资项目经济评价方法与实证研究[D].武汉:华中科技大学,2006.
[4] 施熙灿.水利工程经济学[M]. 4版. 北京:中国水利水电出版社,2010:78-82.
[5] 王振华.建设项目经济评价方法与典型案例分析实用手册[M].北京:地震出版社,2003:661-673.
[6] 梅传芳,余新启,金晓盛.穿黄工程效益及经济评价分析[J].海河水利,2010,(3):61-63.