摘要
以广州地铁某区间盾构隧道线路在穿越河涌一段为例,为实现在狭窄空间及河道范围内进行原有地下桩基础清除,开展沉井拔桩施工技术的研究。经过实践证明,采用沉井拔桩施工技术,恢复桩基础拔除后上方构筑物的支承作用,能减少建筑物的迁改、保护等工程费用,为其他类似工程提供借鉴与参考。
Taking the shield tunnel undercrossing the river in a certain section of Guangzhou subway as an example, in order to clear the original underground pile foundation in the narrow space and within the scope of the river, the research on the construction technology of drawing these piles from the caisson is carried out. It has been proved by practice that the adoption of the construction technology of caisson pile drawing and the restoration of the supporting function of the upper structure after the removal of pile foundation can reduce the engineering cost of building relocation and protection and provide reference for other similar projects.