直立式防波堤桶式结构浮运安装
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Floating transportation and installation of bucket-based structure for upright breakwater
  • 作者:曹义国 ; 夏俊桥
  • 英文作者:CAO Yi-guo;XIA Jun-qiao;CCCC Third Harbor Engineering Co.,Ltd.;
  • 关键词:直立式防波堤 ; 桶式结构 ; 浮运安装 ; 负压下沉 ; 自动控制
  • 英文关键词:upright breakwater;;bucket-based structure;;floating transportation and installation;;negative pressure lowering;;automatic control
  • 中文刊名:GKGC
  • 英文刊名:China Harbour Engineering
  • 机构:中交第三航务工程局有限公司;
  • 出版日期:2016-08-25
  • 出版单位:中国港湾建设
  • 年:2016
  • 期:v.36;No.222
  • 语种:中文;
  • 页:GKGC201608016
  • 页数:5
  • CN:08
  • ISSN:12-1310/U
  • 分类号:64-67+74
摘要
连云港徐圩港区直立式防波堤工程采用一种新型桶式结构,为了解决该结构的海上运输与安装,节省施工费用,施工中采用水上气浮拖带运输,通过排气、排水实现负压下沉,保证了新型桶式结构的顺利实施。在桶式基础结构气浮拖运和负压下沉过程中,通过自动控制系统控制桶式基础结构的姿态和沉放精度,保证了工程质量。
        A novel bucket-based structure is used in the construction of the Xuwei upright breakwater in Lianyungang. In order to resolve the marine transportation and installation problem and save construction cost, the pneumatically floated bucketbased structure is towed by tugboats and installed with negative pressure, thus ensuring the smooth transportation and installation of the bucket-based structure. According to process requirements, the automatic control system is used to control the rise and lowering of the bucket type structure with correct positioning and accuracy during the towing of the pneumatically floated bucket-based structure and the installing of the bucket-based structure with negative pressure to ensure the quality of the works.
引文
[1]中交第三航务工程勘察设计院有限公司.连云港港徐圩港区直立式结构东防波堤工程初步设计[R].2012.CCCC Third Harbor Consultants Co.,Ltd.Preliminary design of vertical structure for the east breakwater for Xuwei Port Area in Lianyungang[R].2012.
    [2]李武,魏冰.桶式结构气浮稳定计算方法[J].中国港湾建设,2016,36(3):16-18.LI Wu,WEI Bing.Air floating stability calculation of bucketbased structure[J].China Harbour Engineering,2016,36(3):16-18.
    [3]JTS 167-2—2009,重力式码头设计与施工规范[S].JTS 167-2—2009,Design and construction code for gravity quay[S].
    [4]祝业浩,倪国平,吴凤亮.防波堤箱筒型基础结构气浮拖运与负压下沉工艺[J].中国港湾建设,2005(5):40-43.ZHU Ye-hao,NI Guo-ping,WU Feng-liang.Technology for towing of pneumatically floated cylindrical substructures and installing with negative pressure for breakwaters[J].China Harbour Engineering,2005(5):40-43.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700