摘要
通过对黄陵二号煤矿416大采高智能化工作面矿压观测的测点布置、观测方法、观测时段及支护质量监测,并将监测数据接入矿井矿压系统,掌握了大采高采煤工作面矿压实时变化规律,为及时调整支护方式、提高支护质量及矿井的安全高效生产提供了保障。
Based on the measuring point arrangement,observation method,observation period and support quality monitoring of mine pressure observation in No. 416 intelligent working face with large mining height in Huangling No. 2 coal mine,through connecting the monitoring data to the mine pressure monitoring system,the real-time change law of the mine pressure in coal mining face was mastered,in order to adjust the supporting mode in time,improve the supporting quality and ensure mine safety and efficient production.
引文
[1]王刚,罗海珠,王继仁,等.近浅埋大采高工作面关键层破断规律研究[J].中国矿业大学学报,2016,45(3):469-474.
[2]陈庆新,彭树兵,魏化明.综采工作面矿压监测方法与应用[J].煤炭技术,2008,27(8):98-100.
[3]郭高川,杨永康,季春旭.近浅埋煤层大采高工作面矿压显现规律研究[J].矿业安全与环保,2016,43(1):26-29.
[4]张亚楠.矿山压力监测系统在综采工作面中的研究应用[J].西部探矿工程,2014,26(3):101-102.
[5]王启堂,何晓光.影响采煤工作面矿山压力因素分析[J].山东煤炭科技,2000,28(S1):111-113.