摘要
为防止建设项目在实施过程中引发地质灾害、减少因不合理工程活动引发的地质灾害给人民生命财产造成损失,以某矿山采空区安置项目为例,通过分析该评估区地质环境条件、查明区内地质灾害的危险性特征,对场地进行综合分区和适宜性分区评估,并提出地质灾害防治措施及建议。
In order to prevent geological hazards caused by construction projects and reduce the loss of people's lives and property caused by geological hazards caused by unreasonable engineering activities, taking a mine goaf resettlement project as an example, by analyzing the geological environment conditions of the evaluation area, identifying the dangerous characteristics of geological hazards in the area, the comprehensive zoning and suitability zoning evaluation of the site are carried out. The prevention measures and suggestions of geological hazards are put forward.