某地铁车站基坑回筑阶段不同换撑设置情况的对比分析
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Retractable Strut Installations During the Backfill of Subway Station Excavations
  • 作者:黄振波
  • 英文作者:HUANG Zhenbo;Shanghai Changkai Geotechnical Engineering Co., Ltd.;
  • 关键词:地铁车站基坑 ; 支撑 ; 换撑 ; 分析比较
  • 英文关键词:Subway Station Excavation;;Bracing Support;;Bracing Replacement;;Comparison and Analysis
  • 中文刊名:TGJC
  • 英文刊名:Soil Engineering and Foundation
  • 机构:上海长凯岩土工程有限公司江苏分公司;
  • 出版日期:2019-06-15
  • 出版单位:土工基础
  • 年:2019
  • 期:v.33;No.142
  • 语种:中文;
  • 页:TGJC201903010
  • 页数:4
  • CN:03
  • ISSN:42-1151/TU
  • 分类号:37-40
摘要
对苏州轨道交通5号线星塘街车站基坑支撑的竖向设置进行分析,通过计算比较了几种不同支撑+换撑组合方案,结果表明:不同的支撑+换撑方案,支护结构最大变形和最大弯矩出现的工况不同,对特定的地铁车站,只要支护结构最大变形在规定值以内,应尽量减少甚至避免回筑阶段的临时换撑,虽然临时换撑的减少或取消会使支护墙体弯矩增加而导致含钢量增加,但整体造价更省,且在施工便利性和工期方面更具优势,研究可为类似工程提供参考。
        During the backfilling of the underground structures for a subway station, if a cross strut needs to be removed, an extractable strut is usually installed below this cross strut. Conventionally, the extractable strut is not optimized for the deformation control. This paper presents a case history of the application of the extractable strut in the supporting of Xingtang Street Station structures for Suzhou Transit Line No.5. The locations of the vertical struts were evaluated. Several different struts plus extractable struts were compared. It is concluded that different strut arrangement resulted in different maximum bending moment and at different locations. For the backfilling of the subway station, the number of extractable struts should be minimized and even avoid as long as the maximum bending moment is within the tolerable limits. Although the reduction of the extractable will result in the increase of the bending moments in the supporting structures and increase the content of steel, the over construction cost is still cost effective.
引文
[1] 武朝军,陈锦剑,叶冠林,等.苏州地铁车站基坑变形特性分析[J].岩土工程学报,2010,32(增1):458-462.
    [2] 刘国斌,王卫东.基坑工程手册(第二版)[M].北京:中国建筑工业出社,2009.
    [3] 娄承滨,施毅,童立元.苏州地铁某车站深基坑变形及支撑轴力规律研究[C].江苏省地基基础年会,2009.
    [4] 周小华.苏州轨道交通1号线深基坑围护结构设计的思考[J].水利与建筑工程学报,2010,8(4):166-168.
    [5] 侯新宇,薛必芳,火映霞,等.地铁换乘站深基坑内支撑体系的优化设计与分析[J].铁道标准设计,2016,60(8):89-94.
    [6] 李向荣,历朋林.地铁车站深基坑换撑施工优化探讨[J].探矿工程(岩土钻掘工程),2009,36(12):47-50.
    [7] 赖友君.地铁深基坑钢支撑内力影响因素分析[J].建筑工程技术与设计,2015(12).

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700