摘要
水轮机在实际运行中存在振动区,水电机组需避免在此区间运行。为此建立了考虑水轮机振动区的水电机组组合优化的发电量最大数学模型,利用分支定界法确定了机组的运行区间,并采用动态规划方法求最优解。实例应用结果表明,分支定界与动态规划相结合的方法适合于水电机组的实际运行情况,且提高了求解精度。
Hydro turbines may be running in the vibration zone,so hydropower units are forbidden to run in this zone.The mathematical model of hydropower unit commitment with maximum electricity is established by considering vibration zone.The branch and bound method is used to determine operating range of generating set and the optimal solution are obtained by using dynamic programming.The example results show that the proposed method is fitted for solving hydropower unit commitment and improves the solution precision.
引文
[1]陈皓勇,王锡凡.机组组合问题的优化方法综述[J].电力系统自动化,1999,23(5):51-56.
[2]赵雪花,黄强,吴建华.蚁群算法在水电站厂内经济运行中的应用[J].水力发电学报,2009,28(2):139-142,138.
[3]陈海良,郭瑞鹏.基于改进离散粒子群算法的电力系统机组组合问题[J].电网技术,2011,35(12):94-99.
[4]王敏蔚,杨莉.采用改进免疫算法的机组组合优化[J].电网技术,2010,34(8):112-117.
[5]Ongsakul W,Petcharaks N.Unit Commitment byEnhanced Adaptive Lagrangian Relaxation[J].IEEETransactions on Power Systems,2004,19(1):620-628.
[6]Ni Ernan,Guan Xiaohong,Li Renhou.SchedulingHydrothermal Power Systems with Cascaded andHead-dependent Reservoirs[J].IEEE Transactionson Power Systems,1999,14(3):1 127-1 132.
[7]任煜峰.水轮发电机组值班(上册)[M].北京:中国电力出版社,2003.
[8]李程煌,常黎,朱斌.水电站安全与经济运行研究及其应用[J].水电自动化与大坝监测,2004,28(6):53-56.
[9]Finardi E C,E L da Silva.Unit Commitment of Single Hydroelectric Plant[J].Electric Power Systems Research,2005,75(2-3):116-123.