基于原状岩芯的大桥岸坡卸荷带划分
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Identification of Unloading Zone of Rock Mass for Bridge Abutments from Undisturbed Rock Core Samples in Deeply Cut River Valley
  • 作者:文海 ; 张永光 ; 锁沛斯
  • 英文作者:WEN Hai;ZHANG Yongguang;SUO Peisi;Yunnan Transportation Consulting Co.;Chuxiong Exploration Institute, Yunnan Non-Ferrous Geological Investigation Bureau;Yunnan Transportation Planning, Design and Research Institute Co., Ltd.;
  • 关键词:半合式单动双管 ; 原状岩芯 ; 卸荷带 ; 快速勘探 ; 岸坡勘察 ; 金沙江特大桥
  • 英文关键词:Semi-closed Single Action Double Tube Rock Core Bit;;Undisturbed Rock Cores;;Unloading Zone;;Rapid Explorations;;River Bank Field Reconnaissance;;Jinsha River Bridge
  • 中文刊名:TGJC
  • 英文刊名:Soil Engineering and Foundation
  • 机构:云南交通咨询有限公司;云南省有色地质局楚雄勘查院;云南省交通规划设计研究院有限公司;
  • 出版日期:2019-06-15
  • 出版单位:土工基础
  • 年:2019
  • 期:v.33;No.142
  • 基金:云南省交通运输厅科技项目(云交科2014(A)01)
  • 语种:中文;
  • 页:TGJC201903022
  • 页数:4
  • CN:03
  • ISSN:42-1151/TU
  • 分类号:96-99
摘要
深切河谷岸坡卸荷带发育,卸荷带范围及性质决定着大桥及墩台位置的选取;平硐勘探耗时长、费用高、安全性差,利用半合式单动双管钻探技术采取原状岩芯样,可快速、经济、安全地对岸坡进行勘探,快速有效地进行岩体结构面及RQD的分析统计,以定性及半定量成果确定卸荷带发育情况及性质,为岸坡稳定性评价奠定基础;在某大桥岸坡勘察中首次采用半合式单动双管钻探采取原状岩芯+整体无损岩芯转移保存技术,进行岸坡卸荷带的原位研究,有效证明了该技术可部分替代平硐勘探,为今后类似大桥岸坡卸荷带快速勘探提供勘察经验。
        The unloading zones in the rock mass are frequently encountered in the deeply cut river valleys. The geological properties and limits of these unloading zones might determine the locations the proposed bridge abutments. The conventional exploration drift method has the disadvantage of time consuming, high cost and poor safety. However, a new exploration method, which utilizes a semi-closed single action double tube rock core bit to extract the undisturbed rock cores, can provide a rapid, cost effective and safe method to investigate the river banks. This method can efficiently analysis the structure plane, perform statistical analysis on rock core RQDs and provide qualitative and semi quantitative evaluation results for the unloading zones at both sides of the river banks. This paper presents the exploration results for the proposed Jiangdi River Bridge in Yongren to Dayao Highway Project. In this project, the semi-closed, single action and double tube rock core bit and undisturbed rock core preservation technique were first used in the evaluation of the unlading geologic zone.
引文
[1] 黄润秋,张倬元,王士天.论岩体结构的表生改造[J].水文地质工程地质,1994.
    [2] 朱容辰.边坡岩体卸荷分带性研究[J].铁道勘察,水文地质工程地质,2010.
    [3] 孙云志,黄润秋.谷坡岩体卸荷带划分量化指标研究[J].岩石力学与工程学报,2012.
    [4] 侯智斌.车庄水利工程枢纽区砂页岩岩体卸荷特征[J].陕西水力发电,2000.
    [5] 任光明,巨广宏,聂德新,等.斜坡岩体卸荷分带量化研究[J].成都理工大学学报(自然科学版),2003.
    [6] 郑达,黄润秋.高边坡岩体卸荷带划分的量化研究[J].水文地质工程地质,2006.
    [7] 赖培华.单动双管钻具在破碎地层钻探中的应用[J].中南水力发电,2000.
    [8] 文海.永仁至大姚高速公江底河特大桥工程地质勘察报告[R].云南:云南省交通规划设计研究院,2017.
    [9] 余伦秀.浅谈提高工勘中岩心采取率的几点措施[J].地质学报,2009.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700