摘要
林地的分类系统极其复杂,而在林地管理规定中常常出现一条规定涉及多个分类的情况,若不能准确理解各分类系统的含义,会使设计用地范围不合规,用地手续不能获批。为此,结合工作中的经验,系统说明林地管理中对水利水电工程临时占用林地的相关规定,重点是与林地保护等级的对应关系,并提出建议。
The classification system of forest land is extremely complex, and in forest management regulations, a rule often involves multiple classifications. If the meaning of each classification system cannot be understood accurately, the land scope of design will not be compliant and the land utilization procedures cannot be approved. Combined with the experiences in practice, relevant regulations on temporary occupation of forest land by water conservancy and hydropower projects in the management of forest land are systematically explained with the emphasis on the corresponding relationship with forest land protection grade. Some suggestions are also put forward.
引文
[1]幸奠勇.对林地地类划分问题的探讨[J].林业调查规划,2017(3):5-7.
[2]李磊,罗涛.水利水电工程建设征地移民安置规划中林地的分类和补偿[J].水力发电,2014,40(3):5-7.
[3]周德生.林地认定差异与“林地一张图”的冲突及竞合探讨—以林业部门和国土部门林地认定为例[J].林业科技通讯,2016(9):81-83.
[4]赵书学.云南省建设工程征占用林地管理存在的问题及对策研究[J].林业调查规划,2010(5):84-89.
[5]齐新.占用征用林地管理的法律思考[J].林业资源管理,2007(1):6-10.
[6]潘沩.征占用林地管理若干问题的探讨[J].中南林业调查规划,2008(5):12-14.
[7]白卫国.关于我国公益林管理的初步思考[J].国家林业局管理干部学院学报,2014(3):22-26.
[8]罗俊璇,黎荣杉.林地保护利用规划研究进展综述[J].防护林科技,2014(8):76-78.