以深水硬基岩地质条件下某大桥的11#主墩深水基础施工为工程背景,从地质情况、施工条件和工程成本等方面进行方案比选,选用锁扣钢管桩围堰施工。介绍了围堰的结构,研究其施工技术,对承台和墩身施工等整个施工过程中的锁扣钢管桩进行结构受力分析,保证了施工安全。对类似工程具有一定的借鉴意义。
With the construction of the deep-water foundation for Main Pier 11# of a certain bridge in the geological conditions of deep-water hard bedrock as the engineering background,various construction schemes for the project are compared and chosen according to the specific geological conditions,construction conditions and engineering costs,upon the basis of which the scheme of locked steel-tube pile cofferdam is finally chosen for the construction of the project. Introduced in the present paper is the structure of the cofferdam, with the construction technique for it studied, and the structural analysis of the locked steel-tube pile during the whole construction process of the cap and the pier body analyzed.With the above-mentioned techniques adopted for the project, the safe construction of it is ensured.The paper may serve as certain useful reference for other similar projects.
引文
[1]夏凌.深水基础锁扣钢管桩围堰施工工艺的应用分析[J].黑龙江交通科技,2018,41(05): 115,117
[2]朱卫东.深水裸岩地质锁扣钢管与混凝土组合桩围堰施工技术研究[J].铁道建筑技术,2018(01): 68-71
[3]赵双龙.路桥工程深水基础钻孔灌注桩施工技术应用研究[J].决策探索(中),2018(01): 89-90
[4]郭万林.大渡河特大桥深水基础钢管桩围堰设计与优化[D].西安:长安大学,2017
[5]陈利.大型深水锁扣钢管桩围堰拆除施工技术[J].建筑安全,2018,33(04): 19-21