不同泊位长度对LNG船系泊的影响
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Effect of different berth lengths on LNG ship mooring
  • 作者:耿宝磊 ; 李伟迁 ; 李焱 ; 高峰
  • 英文作者:GENG Bao-lei;LI Wei-qian;LI Yan;GAO Feng;Tianjin Research Institute of Water Transport Engineering,National Engineering Laboratory for Port Hydraulic Construction Technology & Key Laboratory of Engineering Sediment of Ministry of Communications;College of Harbor,Coastal and Offshore Engineering,Hohai University;School of Architecture and Engineering,Tianjin University;
  • 关键词:LNG船 ; 风浪流联合 ; 泊位长度 ; 系缆力
  • 英文关键词:LNG boat;;combination of wind and wave and current;;berth length;;mooring force
  • 中文刊名:SYGC
  • 英文刊名:Port & Waterway Engineering
  • 机构:交通运输部天津水运工程科学研究院港口水工建筑技术国家工程实验室&工程泥沙交通行业重点实验室;河海大学港口海岸与近海工程学院;天津大学建筑工程学院;
  • 出版日期:2019-06-03 16:43
  • 出版单位:水运工程
  • 年:2019
  • 期:No.557
  • 基金:天津市应用基础与前沿技术研究计划项目(15JCQNJC07300);; 中央级科研院所基本科研业务费资助项目(TKS160107、TKS170217、TKS180402)
  • 语种:中文;
  • 页:SYGC201906008
  • 页数:7
  • CN:06
  • ISSN:11-1871/U
  • 分类号:48-54
摘要
通过1∶60的整体模型试验研究了不同泊位长度对17. 2万m~3LNG船系泊的影响,分析了船舶在风浪流联合作用下的运动量和缆绳张力变化情况。研究表明:横浪、横风、落潮流条件下,泊位长度缩短,艏、艉缆力分担了部分横缆力,对均衡艏、艉缆和横缆力有利,最大缆力变小;顺浪、顺风、落潮流条件下,泊位长度变化对系缆力影响不大;斜浪、横风、落潮流条件下,船舶受斜波作用,其纵横向均分配波浪力,倒缆与横缆或艏艉缆的受力基本相当;顺风时,倒缆力会大于横缆力和艏、艉缆力。该研究为天津LNG项目推荐了合适的泊位长度,可为码头工程设计提供参考。
        The effect of different berth lengths on the mooring of 172,000 m~3 LNG ship is studied by the 1:60 overall model test.The movement and cable tension of the ship under the combined action of wind,wave and flow are analyzed.The research shows that under the conditions of transverse wave,transverse wind and falling current,the length of berth is shortened,and the bow and stern cable force shares part of the transverse cable force,which is beneficial to the balanced bow and stern cable and transverse cable force,and the maximum cable forces become smaller; the change of berth length has little effect on mooring force under the conditions of downwave,downwind and falling current; under the condition of oblique wave,transverse wind and falling current,the ship is affected by oblique wave,and the wave force is distributed in both directions,and the force of spring cable is basically the same as that of transverse cable or bow and stern cable; when the wind is following,the spring force will be greater than the transverse force and the bow and stern force.The study recommends a suitable berth length for the Tianjin LNG project,which can provide reference for the design of the wharf.
引文
[1]沈文君,高峰,谭忠华.LNG船泊位长度优化分析[J].船海工程,2016,45(3):177-179+184.
    [2]李绍武,张志明,杨国平,等.开敞海域中液体散货泊位长度探讨[J].水运工程,2015(2):197-201.
    [3]林在彬,陈国平,张志明,等.开敞式油气码头泊位长度优化[J].水运工程,2012(11):63-67+78.
    [4]时恩哲,裴玉国,罗立群.开敞式码头泊位长度优化试验研究[J].应用基础与工程科学学报,2011,19(6):894-899.
    [5]沈文君,唐桥梁,高峰,等.泊位长度与系缆布置方式对系泊船舶的影响研究[J].中国水运(下半月),2018,18(4):15-17.
    [6]胡昕,吕锐.大型开敞式油码头泊位长度的探讨[J].水运工程,2006(S1):79-82.