摘要
为了确保铺龙湾矿4205工作面顺利安全通过受断层影响的探水巷T3,在分析了探水巷T3与工作面层位关系的基础上,制定了安全过探水巷的方案,并辅以必要的安全辅助措施,成功地保障了工作面快速推过该探水巷,为矿井过该类型老巷尤其是探水巷奠定了基础。
In order to ensure that the Longwan mine 4205 working face successfully through the affected by the fault exploration roadway T3,based on the analysis of the exploration of roadway and working face T3 layer relationship, established safe exploration roadway plan, safe and necessary auxiliary measures, to ensure the success of working face quickly pushed through the exploration roadway, laid the foundation for the type of mine roadway especially exploration roadway.
引文
[1]栾兴亮,陈岐范,韩义.工作面过老巷技术[J].山东煤炭k科技,2002,(6):19-20.
[2]史文飞.煤矿综采工作面过探水巷技术应用分析[J].工程技术(引文版),2017,1(12):327.
[3]马其华,王宜泰.综采面支架渐进调高法过老巷技术[J].煤矿开采,2009,(4):33-35.
[4]张伟.综采工作面过老巷技术探析[J].内蒙古煤炭经济,2017,(1):97-98.
[5]梁锋.综采工作面小角度过老巷双向调采工艺的应用[J]山东煤炭科技,2011,(5):12-13.