摘要
依托工程实例,对重叠隧道施工技术进行了分析,通过分析模型和实际施工中面临的风险,推荐了"先下后上"的施工顺序,并给出了施工中需采取的措施与建议。通过采取一系列措施,该区间顺利完工,其经验可供类似工程借鉴。
This article is based on actual engineering,analyze the construction technology of small distance overlapping tunnel in the soft soil.Via analyzing the model and risks in actual construction,recommended the construction sequence of overlapping tunnel. Given the measures and recommendations to be taken in construction. By taking a series of measures,the tunnel was completed successfully. The experience can be used for similar projects.
引文
[1]梁宁慧.中国城市地铁建设的现状和发展战略[J].重庆建筑大学学报,2008,30(6):81-85.
[2]郭涛.城市轨道交通与可持续发展[J].交通标准化,2006(4):91-92.
[3]刘维.富水地层中重叠隧道施工引起土体变形研究[J].岩土工程学报,2013,35(6):1055-1061.
[4]牛俊涛.软土地区重叠盾构隧道施工空间效应的数值分析[J].天津建设科技,2015,25(2):72-74.
[5]秦银刚.软土地区重叠盾构隧道后掘进隧道对地面及既有隧道的影响[J].天津建设科技,2015,25(5):51-54.