摘要
通过对大量工程设计案例和生产车间建筑数据的分析,构建大豆预处理车间两种厂房建筑层高模型,同时提出特定条件下物料缓冲措施的最佳实践,并分析其对建筑层高的影响,以期为新建项目设备布置提供参考。
Based on the analysis of a large number of engineering design cases and building data of the production workshop, two building floor height models of soybean pretreatment workshop were constructed, and the best practices of material buffering measures under specific conditions were put forward, and the influence of material buffering measures on building floor height was analyzed, so as to provide reference for equipment layout of new projects.