摘要
为验证无人机自带的相机航测所采集的影像能否满足电力配网改造项目中的杆塔间距、高程定位测绘的要求,使用大疆"悟1 V2.0"无人机进行了试验。通过对实地采集控制点与航测软件运算结果进行比较,验证了航拍无人机进行低空摄影测量技术应用于电力配网改造工程中杆塔测绘定位的可实施性及实用性。
In order to verify whether the images collected by the camera of the UAV can meet the requirements of the tower spacing and elevation mapping in the electric power distribution network reconstruction project, the Dajiang "Wu 1 V2.0" UAV was used for the test. By comparing the results of the field acquisition control points with the calculation results of aerial measurement software, the feasibility and practicability of aerial photography UAV for lowaltitude photogrammetry applied to surveying and mapping of engineering tower in electric power distribution network reconstruction were verified.