摘要
本文通过研究工程项目索赔管理风险识别方法和WBS结构分解法的特点,结合某市儿童福利院工程教学综合楼顶层预应力楼盖子项目工程运用WBS-RBS方法构建RBM风险分解矩阵,分析业主方索赔潜在的风险。为风险识别WBS-RBS方法在实际工程运用,提供一些启示。
This paper, through the research project claim management risk identification method and the characteristics of the structure of WBS decomposition method,combining with the city children's welfare home engineering teaching complex prestressed floor( top engineering using WBS-RBS method to build risk matter decomposition of matrix,analysis of the owners claim potential risks.For risk identification WBS-RBS method in practical engineering application,providing a little inspiration.
引文
[1]郭丽强,田延军.基于WBS分解法的工程项目风险识别[J].中国高新技术企业,2009,16(14):132-133.
[2]北京广联达慧中软件技术有限公司,译.Gregory T.H.有效的工作分解结构[M].北京:机械工业出版社,2005.
[3]David Hillson.Research paper using a risk breakdown structure in project management[J].Journal of Facilities management,2003,2(1):85-97.
[4]DavidHillson,Sabrina Grimaldi,Carlo Rafele.managing project risk using a cross risk breakdown matrix[J].Risk management,2006(8):61-76.