新型煤矿井下混凝土搅拌车关键技术研究(英文)
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Research on key technology of new underground concrete mixing truck
  • 作者:赵远 ; 韩振南
  • 英文作者:Yuan ZHAO;Zhen-nan HAN;College of Mechanical Engineering,Taiyuan University of Technology;Shanxi Tiandi Coal Machine Equipment Co.,Ltd.;
  • 关键词:混凝土搅拌车 ; 关键技术 ; 水平布罐 ; 多功能承载平台 ; 旋转操控 ; 摆架结构
  • 英文关键词:Concrete mixing truck;;Key technique;;Horizontal cloth tank;;Multi function bearing platform(MFB platform);;Rotating manipulation;;Swing frame
  • 中文刊名:JCYY
  • 英文刊名:Machine Tool & Hydraulics
  • 机构:太原理工大学机械工程学院;山西天地煤机装备有限公司;
  • 出版日期:2018-06-28
  • 出版单位:机床与液压
  • 年:2018
  • 期:v.46;No.462
  • 基金:sponsored by Two level sub enterprise technological innovation project of China Coal Science and Engineering Group(No.F2008-01)
  • 语种:英文;
  • 页:JCYY201812011
  • 页数:7
  • CN:12
  • ISSN:44-1259/TH
  • 分类号:70-76
摘要
为了改善煤矿井下混凝土供料的落后状况设计了一种新型煤矿井下用混凝土搅拌车,阐述了该新型煤矿井下混凝土搅拌车设计过程中的关键技术。由于受到煤矿井下巷道高度的限制,搅拌车在满足巷道行驶的前提下,混凝土运送量同样需要达到要求指标。整车设计方案充分考虑了整车通过性,搅拌罐卸料高度、填充率、水平布置罐口密封等环节,并给出设计方案;设计了多功能承载平台,可快速更换工作机构,实现一机多用;研究设计了独立驾驶室旋转操控单元,在视线不佳的煤矿巷道中,实现双向操作;设计了下摆架结构,使得车辆行驶适应煤矿巷道恶劣路面;并在原本紧凑车体上加装了减振系统,降低驾驶室振动加速度,有效缓解驾驶疲劳。该车设计方案可满足煤矿井下混凝土长距离运输,避免了传统材料车运输混凝土存在的离析、分层、漏料、硬化等现象,解决了混凝土供给不及时,路面硬化质量差等问题。
        In order to improve the backwardness of the coagulant supply in the coal mine,a new type of concrete mixer used in underground coal mine is designed,and the key technology in the design process of the new type of concrete mixer truck is described,which is restricted by the height of the underground mine roadway.The concrete transport volume is the same as the mixing truck meets the driving condition of the roadway.The sample needs to meet certain indicators.The design scheme of the whole vehicle fully considers the passing of the passing of the whole vehicle,the height of the dump in the tank,the filling rate and the sealing of the tank mouth,and gives the design scheme.The multi-function bearing(MFB) platform is designed,which can quickly replace the working mechanism and realize the multi-use of a machine.In this way operation is realized.
引文
[1]ZHAO Yuan.Summary of research on concrete mixing truck in coal mine[J].coal engineering,2015,4(9):137-139143.
    [2]YANG Jiming.Design of spiral blade for mixing drum of concrete mixing truck(Part I)[J].1984(2):8.
    [3]YANG Jiming.Design of mixing blades for concrete mixing truck(II)[J].1984(3):19.
    [4]ZHU Zhihui,CHEN Chen,WANG Jingang.Optimization design of front frame of mixing truck[J].Journal of Hebei University of Technology,2015(1):78-82.
    [5]SHI Boqiang,RAO Qilin.Underground auxiliary vehicle[M].Beijing:Metallurgical Industry Press,2006:205-218.
    [6]ZHENG Wenguang,GAO Welfare,REN Xueping.Experimental study on dynamic strain test of key parts of concrete mixer truck[J].lifting crane,2009(5):73-75.
    [7]Utimec LF500 Transmixer[EB/OL].http://www.normet.com,2012.5.25.
    [8]MA Fengping,LIN Guangxu.Verification analysis of truck mounted truck mixer[J].coal mine machinery,2012,33(3):101-103.
    [9]Study on the mixing drum system of Li Jun.HC-1.5 concrete transport truck[J].non-ferrous metals,1997(11):15-1.
    [10]WANG Fei,LIU Fangxing,LIU Jianwen.A new type of concrete mixing truck[J].special purpose vehicle,2010(11):50-52.
    [11]YANG Wei,WANG Dianwu.Simulation study on ride comfort of underground vehicle based on ADAMS[J].mining machinery,2012,40(6):40-42.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700