山区公路施工时,山体滑坡是较严重的地质灾害。某在建高速公路发生山体滑坡灾害,使该段主线及互通区桥梁、路基发生位移,失稳。滑坡发生后,采用了调整线路,绕避滑坡,以抗滑桩、挡墙和清方卸载的综合处理措施进行处理,取得了较好的施工效果。
Mountainous area highway construction, the landslide is a serious geological disasters. A building highway landslide disasters, make this thread and each district bridge, embankment displacement occurs, instability. After the landslide, the adjusting circuit, preventing landslide, anti-slide pile and retaining wall and side unloading comprehensi effects have ve treatment measures for processing, good construction been achieved.