基于徐州市轨道交通2号线周庄站—七里沟站区间下穿既有京沪铁路的实际情况,分析研究盾构下穿施工对京沪铁路地表(路基)沉降的影响,结合有关铁路轨道变形控制标准,提出盾构下穿京沪铁路的施工技术措施,保证了铁路运输安全。
Based on the actual situation of the section between Zhouzhuang station – Qiligou station of Xuzhou metro line 2 under-passing the existing Beijing-Shanghai railway line, this paper makes an analysis and a study of impact of the shield tunneling under passing construction on the settlement of surface(including roadbed) of the Beijing-Shanghai railway line. Taking into consideration of the railway track deformation control standards, it puts forward the construction technical measures of the shield tunneling under passing the Beijing-Shanghai railway line and ensures the safety of railway operation.
引文
[1]游龙飞,王效文,龚彦峰,等.盾构下穿新建铁路站场地基预处理技术研究[J].铁道工程学报,2012(6).
[2]李阳.盾构隧道下穿高速铁路安全评价体系研究[D].四川成都:西南交通大学,2013.
[3]晏胜荣,贺飞.地表不具备钻探条件下的盾构机通过空洞地段施工技术[J].探矿工程(岩土钻掘工程),2008(9).
[4]中铁第四勘察设计院集团有限公司.周庄—七里沟下穿京沪铁路报告[R].湖北武汉:中铁第四勘察设计院集团有限公司,2016.
[5]中铁第四勘察设计院集团有限公司.徐州市轨道交通2号线一期工程下穿铁路专题研究[R].湖北武汉:中铁第四勘察设计院集团有限公司,2016.