预应力混凝土现浇箱梁施工与质量控制分析
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Construction and Quality Control Analysis of Prestressed Concrete Cast-in-place Box Girder
  • 作者:高淑利
  • 英文作者:Gao Shuli;Shanxi Jinzhong Road and Bridge Construction Group Co., Ltd.;
  • 关键词:高速公路 ; 预应力混凝土箱梁 ; 质量控制
  • 英文关键词:Expressway;;Prestressed concrete box girder;;Quality control
  • 中文刊名:JXJC
  • 英文刊名:Jiangxi Building Materials
  • 机构:山西省晋中路桥建设集团有限公司;
  • 出版日期:2019-06-30
  • 出版单位:江西建材
  • 年:2019
  • 期:No.245
  • 语种:中文;
  • 页:JXJC201906091
  • 页数:2
  • CN:06
  • ISSN:36-1104/TU
  • 分类号:152-153
摘要
基于某高速公路预应力混凝土现浇箱梁施工实践,从施工准备、模板施工、混凝土施工、预应力张拉与压浆等方面对箱梁施工全过程进行阐述,总结了施工要点,并提出了质量控制措施。
        Based on the construction practice of precast concrete precast box girder of a highway, the whole process of box girder construction is expounded from the aspects of construction preparation, formwork construction, concrete construction, prestressed tension and grouting, and the construction points are summarized. Quality control measures were proposed.
引文
[1]张勇勇.预应力混凝土现浇箱梁质量控制要点研究[J].山西建筑,2019(06):164-165.
    [2]王刚.装配式预应力混凝土箱梁施工及质量控制[J].交通世界,2018(11):119-120.
    [3]王文生.预应力混凝土箱梁施工质量控制[J].公路交通科技(应用技术版),2016(09):249-250.
    [4]陆明峰.预应力混凝土连续箱梁施工质量控制要点[J].四川水泥,2017(03):268.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700