摘要
选取新建兰州到重庆铁路线广元到渭沱段的施工情况作为研究背景,探讨了四电集成系统施工技术,分析了该技术的施工要点及注意事项,取得了良好的施工效果。
Taking the construction of Guangyuan to Weituo section of the new Lanzhou to Chongqing railway line as the research background, this paper discusses the construction technology of the four-electricity integrated system, analyzes the key points and matters needing attention of the construction technology, and obtains good construction results.
引文
[1]寇宗乾,李学斌.高速铁路“四电”集成技术与管理[J].铁道建筑技术,2008(6):15-19.
[2]张新芳.京津城际铁路通信系统集成方案及关键技术[J].铁道通信信号,2009(11):49-52.
[3]祝晓红.高速铁路“四电”系统集成接口管理探讨[J].现代城市轨道交通,2017(1):65-68.