摘要
介绍了#1机组DEH系统的基本情况、DEH系统的组成及升级改造的范围。通过DEH系统过程调试和故障处理,使检修维护人员对系统有了进一步的认识。经过带阀门的系统仿真,确保了机组顺利启动并网发电。
In this paper,the basic situation of DCS system(including DEH system)of#1 unit,the composition of DEH system and the scope of this upgrade are introduced.Through process debugging and fault handling of the DEH system,the maintenance personnel have a further understanding of the system.Through the system simulation with valve,the successful grid-connection of the unit for power generation is ensured.