摘要
以安徽某大型创新业态商业中心工程为例,总结BIM系列软件的交互方法流程及在工程开发阶段、招投标阶段、施工阶段的应用价值,并深入探讨BIM模型上下游转换率、运维阶段BIM模型、BIM+VR+城市综合管廊等BIM技术关键问题及发展趋势。
Based on the situation of BIM technology, this article took a large commercial complex project as an example, summarized a series of BIM software's interaction method and the application value in engineering's development stage, bidding stage and construction stage. Further, the key issues and development trends about conversion rate of BIM model, maintenance stage's BIM model and BIM+VR+ urban comprehensive tube gallery had been studied.
引文
[1]赵昕,马智亮,张建平,等.中国建筑施工行业信息化发展报告(2015)——BIM深度应用与发展[M].北京:中国城市出版社,2015.
[2]张俊,张宇贝,申伟.基于AHP的施工企业应用BIM风险因素分析[J].北京建筑大学学报, 2017, 33(1):69–75.
[3]柳婷,陈小松,张伟.无人机倾斜摄影辅助BIM+GIS技术在城市轨道交通规划选线中的应用[J].测绘通报, 2017(S1):197–200.
[4]湫叶.工匠谈BIM之以“工匠精神”看BIM发展[EB/OL].http://bbs.co188.com/thread—9285829—1—1.html, 2016–8.