建设项目入河排污口设置论证分析——以长沙县某污水处理厂一期工程为例
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Analysis on the Confirmation Case of the Settlement of the Sewage Discharge Port of the Construction Project——Taking the First Phase of a Sewage Treatment Plant in Changsha County as an Example
  • 作者:景璟 ; 杨敏 ; 郑玄 ; 周聪 ; 郑学铭 ; 夏畅斌 ; 刘春华 ; 赵文玉
  • 英文作者:Jing Jing;Yang Min;Zheng Xuan;Zhou Cong;Zheng Xueming;Xia Changbin;Liu Chunhua;Zhao Wenyu;Changsha University of Science and Technology, School of Chemical and Food Engineering;Changsha University of Science and Technology,Key Laboratory of Dongting Lake Aquatic Eco-Environmental Control and Restoration of Hunan Province;
  • 关键词:建设项目 ; 入河排污口 ; 水功能区 ; 水生态
  • 英文关键词:construction project;;sewage discharge outlets into the river;;water function area;;water ecology
  • 中文刊名:GDHG
  • 英文刊名:Guangdong Chemical Industry
  • 机构:长沙理工大学化学与食品工程学院;长沙理工大学洞庭湖水环境治理与生态修复湖南省重点实验室;
  • 出版日期:2019-04-30
  • 出版单位:广东化工
  • 年:2019
  • 期:v.46;No.394
  • 基金:湖南省自然科学基金青年项目(2019JJ50646);; 湖南省教育厅科学研究项目(18C0206);; 湖南省重点研发计划项目(2018SK2011);; 湖南省水生资源食品加工工程技术研究中心开放基金(2018KJY11);; 洞庭湖水环境治理与生态修复湖南省重点实验室开放基金资助(2018DT02)
  • 语种:中文;
  • 页:GDHG201908059
  • 页数:3
  • CN:08
  • ISSN:44-1238/TQ
  • 分类号:149-151
摘要
以长沙县某污水处理厂一期工程项目为例,全面的论述了建设项目入河排污口设置论证报告中主要内容:排污口所在水功能区管理要求和取排水状况分析,排污口设置后污水排放对水功能区的影响范围,排污口设置对水功能区水质和水生态影响分析,排污口设置对有利害关系的第三者权益的影响分析,排污口设置合理性分析等。建设项目入河排污口设置论证工作的开展,为各级水行政主管部门或流域管理机构审批入河排污口以及建设单位合理设置入河排污口提供科学依据,以保障生活、生产和生态用水安全。为建设项目入河排污口设置论证工作提供了有利指导。
        Taking the first phase project of a sewage treatment plant in Changsha County as an example, the main contents of the demonstration report on the sewage discharge port of the construction project are: the management requirements of the water function area where the sewage outlet is located and the analysis of the water intake and drainage situation, and the sewage discharge to the water after the sewage outlet is set. The scope of influence of the functional area, the analysis of the impact of the sewage outlet on the water quality and water ecology of the water function area, and the impact analysis of the sewage outlet setting on the interest of the third party, and the rational analysis of the setting of the sewage outlet into the river was comprehensively discussed. The development of the demonstration project for the construction of sewage outfalls into the river shall provide scientific basis for the water administrative departments at all levels or the river basin management agencies to approve the sewage outfalls into the river and the construction units to properly set up the sewage outfalls to the river to ensure the safety of life, production and ecological water. It provides a favorable reference for the demonstration work of the construction project to enter the river sewage outlet.
引文
[1]杨国胜,叶闽,李德旺,等.建设项目入河排污口设置论证分析[J].人民长江,2008,39(23):59-61.
    [2]石秋池.把住入河排污关,加强水功能区监督管理[J].中国水利,2007,7:1-3.
    [3]吴春霞,彭博.入河排污口设置论证与有关问题讨论[J].水资源保护,2015,31(2):84-88.
    [4]Nguyen T T,Ngo H H,Guo W,et al.,Implementation of a specific urban watermanagement-SpongeCity[J].ScienceofTheTotalEnvironment,2019.652:147-162.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700