摘要
针对海底电缆长度长,铅套需长时间连续稳定生产、工艺难以控制的特点,通过设备选型布局、工装模具选配以及工艺过程控制,解决了铅套长时间连续稳定生产的难点问题。
Due to the long length of submarine cable,it requires lead extruder should be stable for a long time. What's more,the lead sheath production process is difficult to control. In order to fix all these issues,the paper shows some ideas about equipment selection layout,reasonable matching tooling,and detailed process control measures.