摘要
建筑全生命期BIM技术在上海国际金融中心项目中得到了全面的应用和推广。基于该项目工程实践,分析建筑全生命期BIM技术的应用重点,阐述BIM技术在建筑全生命期项目筹划、建筑设计、工程施工、运维管理等各阶段的主要做法和具体应用,以期为类似复杂项目的管理提供借鉴。
The building life cycle BIM technology has been comprehensively applied and popularized in Shanghai International Financial Center project. Through the engineering practice,this paper analyzes the application keypoints of BIM technology in the whole life period of the project,and expounds the main methods and concrete applications of BIM technology in the whole life period of project planning,architectural design,engineering construction,operation and maintenance management,etc. So as to provide reference for the project management of similar complex projects.
引文
[1]张建平,刘强,张弥,等.建设方主导的上海国际金融中心项目BIM应用研究[J].施工技术,2015(6):29-34.
[2]吴强.全过程BIM+项目管理模式在上海世博会博物馆项目中的实施[J].建筑经济,2018(3):35-38.
[3]周千帆,彭波,陈洁,等.UIP模式下的BIM全生命周期应用研究[J].施工技术,2019(1):13-16,21.
[4]胡琦.基于BIM的超高层建筑智慧运营平台[J].现代建筑电气,2016(7):66-71.