采场底部出矿结构一直是矿山施工的难题。针对某铅锌矿浅孔留矿法开采中存在的出矿难题,提出无底柱电耙出矿结构的改造方案,与原传统出矿方式相比,现场应用情况证明,该底部出矿结构不仅有效提高了出矿效率,并且降低平均采矿成本17.5元/t,产生了良好的经济效益。
The bottom structure of ore-drawing was always the challenge in mine construction.According to the ore drawing problems of short-hole shrinkage mining in a leadzinc mine,a reforming scheme of non-pillar ore drawing with scraper was proposed.Field application indicated that,compared with original ore-drawing method,the new scheme not only improved the ore-drawing efficiency obviously,but also reduced the average mining cost by 17.5RMB/ton,having good economic benefits.
引文
[1]王春光,杨桂涛.电耙出矿留矿采矿法在丰宁金龙的试验研究[J].采矿技术,2013,13(06):10-11.
[2]王科洪,陈星明.厚大矿体浅孔留矿法底部结构的改进及实践[J].矿业研究与开发,2016,36(01):19-22.
[3]阳雨平,林翔,邓星星,等.瑶岗仙钨矿倾斜极薄矿体爆破参数优选与采矿方法改进[J].有色金属工程,2014(05):52-55.
[4]黄家贤,宋甫,危流永,等.珊瑚黑钨矿浅孔留矿法优化研究[J].采矿技术,2015,15(01):10-13.
[5]唐秀伟,李建文,韦志兴,等.大新锰矿西北重叠矿体矿石运搬工艺系统优化[J].金属矿山,2015(05):12-15.
[6]李电辉,褚洪涛,刘俊,等.李子金矿浅孔留矿采矿法底部结构的优化试验[J].黄金,2014(04):40-43.
[7]李伟华,罗佳,詹进.李楼-吴集铁矿底部结构回采方案研究[J].采矿技术,2015,15(06):12-14,97.
[8]任卫东.全面采矿法底部结构及出矿方式的研究与应用[J].矿冶工程,2015,35(5):25-27.