简要介绍了石家庄市赵村铺煤矿突水淹井事故的经过,突水条件的分析,堵水方案的选择,堵水复矿工程的实施,堵水效果的分析预计,以及经验教训,为类似突水事故的快速治理提供了一定的参考价值。
This paper briefly introduces the mine-flooding accident caused by water-burst in Zhaocunpu coal mine in Shijiazhuang,analyzes the water-burst condition, the scheme selection of stopping up water, the implementation of project of stopping up water and recovering the mine back, the analysis and prediction of water shutoff effect, as well as the experiences and lessons. It provides a certain reference value for the rapid management of similar water-burst accidents.
引文
[1]李誉荣,王墨生,冯金文.井陉矿务局临城矿0807面底板突水与地面注浆堵水[J].河北勘察,2002(3):44-48.
[2]马苒.谈两渡矿注浆堵水实践[J].科学之友,2006(8):32-33.
[3]邓云辉,薛小奇,于计华,等.平禹一矿特大突水灾害治理及快速复矿技术研究[J].现代矿业,2010(2):136-138.
[4]王强.常德青峰煤矿地面钻孔注浆堵水实践[J].探矿工程,2011,38(4):63-65.