摘要
在山区或高丘陵建矿山的总图设计中,总图的竖向设计多采用台阶式布置形式,场地台阶式布置增加了场地的不稳定性,同时边坡治理、场地排雨水、综合管网的难度性增大,各标高与采选工艺流程的协调会因工程不同带来局限性或适应性。针对矿山总图台阶式竖向布置的特点,以矿山所建选厂为例,分析了其台阶式场地竖向布置的特点,根据该选厂场地的地形地势,对选厂的功能区域进行了合理的划分,并介绍了台阶的衔接、整平和排雨水方式,以供类似矿山工程参考借鉴。
In the mountains or hills in the general layout design of high building,the use of vertical design of general layout step,the site step layout increases the instability of the site,at the same time,the difficulty of slope treatment,site drainage,and integrated pipe network is increasing,the coordination of the elevation and the process will be brought about imitation or adaptability by different projects.According to the characteristics of general stepped vertical arrangement,a case study of a selected mine,this paper analyzes the characteristics of the vertical layout of the step type site,according to the topography of the site,the function area of the plant is divided reasonably,and introduces the steps of the connection,leveling and rainwater drainage way,for reference for similar projects.
引文
[1]有色冶金企业总图运输设计参考资料编写组.有色冶金企业总图运输设计参考资料[M].北京:冶金工业出版社,1981.
[2]建筑边坡工程技术规编写组.建筑边坡工程技术规范[M].北京:中国建筑工业出版社,2014.