摘要
煤场挡土墙基础对地基的承载力要求较高,在天然地基承载力或变形不能满足上部结构要求时,一般要采用人工方法对地基进行强化处理。本文结合工程地质及现场效果,对不同的地基处理方案进行了技术经济分析,综合认为预制方桩比振冲碎石桩复合地基经济,技术上更为优化,为类似场地挡煤墙基础地基处理积累了工程经验。
The retaining wall of coal yard needs a high requirement of foundation bearing capacity. When the bearing capacity or the distortion of natural foundation can not meet the design's requirement, foundation treatment usually can be taken to strengthen it by hand. According to the engineering geology and the actural site conditions, the different schemes for strengthening the foundation were introduced through technical and economic analysis. The results showed that the precast square pile is better than the vibro-replacement stone column, which could accumulate engineering experience for retaining wall foundation treatment in similar sites.
引文
[1]JGJ94-2008.建筑桩基技术规范[S].北京:中国建筑工业出版社,2008JGJ94-2008. Technical code for building pile foundation[S].Beijing:China Architecture&Building Press, 2008
[2] DL 5022-2012火力发电厂土建结构设计技术规程[S].北京:中国计划出版社,2012DL 5022-2012 Technical code for the design of civil structure of fossil-fired power plant[S]. Beijing:China planning press, 2012
[3]JGJ792-2002.建筑地基处理技术规范[S].北京:中国建筑工业出版社,2008JGJ792-2002. Technical code for ground treatment of buildings[S]. Beijing:China Architecture&Building Press, 2012