摘要
本文针对江西省乐平市众埠镇上流源村自然特征、排污特点和治理现状,通过采用水平潜流人工湿地对其生活污水进行处理,提出了工程设计总体思路,以及工程结构各组成部分实际应用的具体方法,并分析了工程投资成本及建后运行效果,为我省低山丘陵区农村水环境治理提供可参照的模式.
In view of the natural characteristics,the sewage characteristics and the management status of the Shangliuyuan village in the town of Leping city,Jiangxi province,this paper uses the horizontal subsurface flow constructed wetland to deal with the rural sewage,puts forward the general idea of the engineering design and the practical application of the engineering structure,besides,the paper analyzes the cost of the project and the operation effect after the construction of the project,which provides a reference model for the rural water environment management in the hilly areas of our province.
引文
[1]《砌体结构设计规范》GB 500032001.
[2]人工湿地污水处理技术导则[M].北京:中国建设工业出版社,2009.
[3]《人工湿地污水处理工程技术规范》HJ2005-2010.
[4]冀海寿.人工湿地在农村生活污水中的设计应用[J].科技向导,2012,(05):239~279.
[5]夏汉平.人工湿地处理污水的机理与效率[J].生态学杂志.2002,21(4):51~598.
[6]Kenneth R.Foster,Karen Mc Donald,Kim Eastlick Development and Application of Critical,Target and Monitoring Loads for the Management of Acid Deposition in Alberta,Canada,[J].Water,Air and Soil Pollution:Focus,2001,Vol.1(1).
[7]姚枝良,闻岳,李剑波,等.人工湿地处理系统的运行管理与维护[J].四川环境,2006,25(5):41~44.