摘要
在霍尔三维结构的基础上,结合WBS的综合编码体系,提出基于WBS和霍尔三维结构的城市公共基础设施综合集成管理模式,并借助多级模糊综合评价方法建立了城市公共基础设施综合管理评价体系,最后就具体项目进行了实例应用。
On the basis of systems engineering "3D model" from Hall, the paper introduces the multidimensional model integrated management of public infrastructure in the city project based on WBS, moreover summarizes the comprehensive coding system of WBS,utilizes multi-level fuzzy comprehensive appraisal method to establish the system of comprehensive appraisal, and applies it to analyze the specific project.
引文
[1]邢恩深.基础设施建设项目投融资操作实务[M].同济大学出版社,2005.
[2]Amir M,Sharif.Benchmarking performance management systems[J].An International Journal of Benchmarking,2002.
[3]何清华,陈发标.建设项目全寿命周期集成化管理模式的研究[J].重庆建筑大学学报,2001(04).
[4]江萍,成虎.施工项目结构分解(WBS)方法及准则研究[J].东南大学学报(自然科学版),2000,30(4):105-108.
[5]王艳伟,王松江,黄宜.基于霍尔三维模式的中小水电站PROT与TOT比较研究[J].水电能源科学,2013,05:152-154.
[6]叶义成,等.系统综合评价技术[M].冶金工业出版社,2006.