The development of interstate electric ties ISETs and grids(ISGs) is a global process; recently, countries of Northeast Asia(NEA) that were previously very poorly connected have started to study the possibility of constructing ISETs and ISGs. This paper describes the current state of the interstate transmissions in the NEA region, considering the prospective projects of ISETs in NEA. The results of the system optimization study on prospective NEA ISGs are provided. The proposals on the development of electric power cooperation in NEA are formulated.
The development of interstate electric ties ISETs and grids(ISGs) is a global process; recently, countries of Northeast Asia(NEA) that were previously very poorly connected have started to study the possibility of constructing ISETs and ISGs. This paper describes the current state of the interstate transmissions in the NEA region, considering the prospective projects of ISETs in NEA. The results of the system optimization study on prospective NEA ISGs are provided. The proposals on the development of electric power cooperation in NEA are formulated.
引文
[1]Berdnikov R(2012)Cooperation between JSC“FGC UES”and power companies of People’s Republic of China:provision and development of electricity export(in Russian).http://futuregrid.ru/upload/iblock/b45/KHP_28.04.12.pdf
[2]Batmunkh YU(2017)Mongolian Perspective on Power Interconnection.https://www.unescap.org/sites/default/files/D1-S2e.%20Mongolian%20Ministry%20of%20Energy_Mr.%20Yeren-Ulzii%20Batmunkh.pdf
[3]Yoon J,Park D,Kim H(2008)The Pre-feasibility Results of NEAREST between the ROK,and the DRPK,and RF.In:Proceedings of the 6th International Conference Asian Energy Cooperation:Forecast and Realities,pp:59-67
[4]Kyeon H(2014)Korea-China Grid Interconnection Feasibility Study:Approach,Findings and Lessons.Paper presented at the20th International Conference on Electrical Engineering.15-19June 2014.Jeju,Republic of Korea
[5]Seung-Il M(2014)Role of Korea for Developing the East Asia Super Grid.In:the 20th International Conference on Electrical Engineering.15-19 June 2014.Jeju,Republic of Korea
[6]Takaki T(2016)SoftBank’s Asia power grid plan advances in the face of challenges.http://www.japantimes.co.jp/news/2016/12/01/business/corporate-business/softbanks-asiapower-grid-plan-advances-face-challenges/#.WJh Nmf JJeik
[7]Mano S,Ovgor B,Samadov Z et al(2014)Gobiteсand Asian Super Grid for Renewable Energies in Northeast Asia.https://www.renewable-ei.org/images/pdf/20140124/Gobitec_and_ASG_report_ENG_BOOK_final.pdf
[8]Belyaev LS,Chudinova LY,Khamisov OV et al(2002)Studies of interstate electric ties in Northeast Asia,International Journal of Global Energy Issues 17(3):228-249
[9]Belyaev LS,Podkovalnikov SV,Saveliev VA(2008)Effectiveness of interstate electric ties.Novosibirsk:Nauka,239p(in Russian)
[10]Belyaev LS,Chudinova LY,Khamisov OV(2000)Power integration in Northeast Asia:Studies and Prospects.In:Proceedings of the 2nd International Conference“Energy Integration in Northeast Asia”,September 21-22,2000,Irkutsk,Russia.Irkutsk:Energy Systems Institute,2000,pp:19-24(in Russian)
[11]Prima Media.ru(2013)A 1000 MW nuclear power plant is planned to be constructed in Primorie.http://primamedia.ru/news/284469/(in Russian)
[12]Otsuki T,Isa ABM,and Samuelson RD(2016)Electric Power Grid Interconnections in Northeast Asia:A Quantitative Analysis of Opportunities and Challenges.Energy Policy,Vol.89,pp:311-329
[13]Podkovalnikov S,Saveliev V,Chudinova LY(2015)Study of system effectiveness of interstate power grid to be developed in Northeast Asia.In:Proceedings of Russian Academy of sciences.Energy,Vol.5,pp:16-32(in Russian)