摘要
介绍了吹填土浅层真空预压施工工艺流程,从多项施工技术控制的角度出发,探讨与分析吹填土浅层真空预压在施工过程中的控制要点,并提出了相应的建议和措施,包括土工织物的质量控制、竖向与水平向的"板-管"一体施工和长短间隔式竖向排水板体系以及开泵数量或开泵率的控制等。
This paper introduces the process of the vacuum preloading of the surface-layer in dredger fill.From the perspective of multiple construction control measures,it discusses and analyses the the key control points in the construction process of vacuum preloading of the surface-layer in dredger fill,and gives corresponding suggestions,such as fabric quality control,integrated construction of 'plate-tube' in vertical and horizontal directions,arrangement of vertical drainage boards with 'long-short' intervals,and control of running pump number or running pump ratio,etc.
引文
[1]刘兵,蔡南树,艾英钵.大面积吹填软土地基真空预压施工工艺[J].水运工程,2006(9):73-76.
[2]谭再坤,王东芳.真空预压软基加固新工艺应用探讨[J].港工技术,2009,46(S1):105-108.
[3]侯延祥.真空预压关键工序的质量控制与管理[J].水运工程,2002(7):110-112.
[4]仓基俊,关云飞,李小梅.吹填软基无砂垫层真空预压快速加固新技术及现场试验研究[J].水电能源科学,2012,30(2):92-94.
[5]关云飞,唐彤芝,陈海军,等.超软地基真空预压浅层加固现场试验研究[J].岩土工程学报,2011,33(S1):104-108.
[6]关云飞.吹填淤泥固结特性与地基处理试验研究[D].南京:南京水利科学研究院,2009.
[7]李小梅,唐彤芝,关云飞,等.新近吹填淤泥地基加固效果分析[J].施工技术,2011,40(24):47-50,88.
[8]胡利文,王永平.南沙港区陆域吹填工程真空预压软基处理技术[J].施工技术,2004,33(10):65-68.
[9]林少波,黄建华,陈平山.浅层加固技术中抽真空作用强度对加固效果的影响[J].水运工程,2011(2):108-110,119.