摘要
煤矿井下巷道贯通测量的质量对整个矿井生产的影响较大,全面提升煤矿井下巷道贯通测量精度较为关键。本文将郭庄煤矿井下贯通测量作为实际分析案例,对比选择了贯通测量方案,分析了本次矿山测量的精度要求,设计了地面、井下的平面控制、高层控制方案,计算得到贯通误差预计均小于设计精度,为现场贯通施工提供了依据。
The quality of tunnel through surveying in coal mine has great influence on the whole mine production, and it is the key to comprehensively improve the accuracy of tunnel penetration measurement in coal mine. In this paper, the hole through measurement of Guozhuang Coal Mine is taken as an actual analysis case, the penetration measurement scheme is selected, the precision requirement of the mine measurement is analyzed, the plane control and the high rise control scheme are designed for the ground, underground, and the calculation is less than the design precision, which provides the basis for the field through construction.
引文
[1]刘瑞敏.地面沉降对城市轨道交通高程贯通测量误差的影响及应对措施[J].测绘通报,2014(08):68-72.
[2]袁会,连会青,韩永.煤矿两立井多巷道贯通测量方案及精度保证技术[J].煤矿开采,2013,18(04):14-16+32.
[3]张虎保.焦冲金矿-460~-580m中段盲回风斜井贯通测量实践[J].有色金属(矿山部分),2010,62(03):51-54.
[4]叶维楚,姜京福,王芝峰.提高千米深井高矿压条件下大型贯通测量精度的方法[J].矿山测量,2011(01):37-38.
[5]王为申,宗琳,齐长春.落陵煤矿M701中运贯通测量方案的设计和精度评定[J].矿山测量,2011(01):53-54.
[6]史永强.基于Excel VBA的巷道贯通测量误差预计程序设计[J].矿山测量,2012(06):35-37.
[7]王晋林,况建设.测点极不稳定情况下跨采区工作面贯通测量工作实践[J].煤炭技术,2008(05):124-125.