摘要
西南电力设计院有限公司在引进国外先进数字化设计软件的基础上,打造了数字化协同设计平台,建立了涵盖机械、电控和土建的数字化设计完善的数据库体系。该数字化设计成果在九江电厂基建过程中得到了充分利用,实现了设计采购一体化、可视化施工指导、施工过程模拟、施工进度模拟以及隐蔽工程可视化,达到了提升工程质量、降低工程造价和缩短工程工期的目的。
On the basis of introducing advanced digital design software, Southwest Electric Power Design Institute has built a digital collaborative design platform and established a complete database system covering the digital design of machinery, electronic control and civil engineering. The digital design achievements have been fully utilized in the capital construction process of Jiujiang Power Plant. The integration of design and procurement, visual construction guidance, construction process simulation, and construction progress simulation have been realized. The purpose of improving project quality, reducing project cost and shortening project duration has been achieved.
引文
[1]刘明,白佳.基建阶段火电机组管道支吊架全过程监督管理探讨[J].内蒙古电力技术,2017,35(4):87-91.
[2]黄永军.重庆神华万州电厂新建工程数字化设计应用总结报告[R].成都:西南电力设计院有限公司,2014.
[3]王继强,赵长青.火电厂三维数字化系统在山东莱州电厂的应用[J].上海电力学院学报,2014,30(5):443-450.
[4]高文松,王刚.三维数字化电厂建设探讨[J].华电技术,2018,40(2):1-3.
[5]周慧娟,管友新.PDMS三维设计软件在火力发电厂水工专业地下管网设计中的应用[J].广东科技,2015(6):10-12.