摘要
对于在西藏高海拔深切峡谷地区建设水电工程,面临水文气象缺少、地质环境条件多变、工程设计规模巨大、高水头超大机组容量、筑坝建设环境复杂等方面问题。中国电建集团华东勘测设计研究院有限公司投入了极大的努力,结合自身丰富的工程经验,对流域的一些独特水文、地质、水工结构、水轮发电机组、筑坝材料等,开展了一系列的研究工作,积累了大量研究成果。
For the construction of hydropower projects in the high-altitude deep gorge area of Tibet,it is facing some problemswith less hydrometeorology data,variable geological environment condition,huge engineering design scale,super large capacityhydro-generator unit with high water head and complex dam filling environment. Power China Huadong Engineering CorporationLimited has invested a great deal of effort to research the special hydrogeology,geological environment,hydraulic structure,hydro-generator unit and dam filling materials based on its abundant engineering experience in hydropower projects,and a largeamount of research results have been achieved.
引文
[1]张进江,季建清,钟大赉,等.东喜马拉雅南迦巴瓦构造结的构造格局及形成过程探讨[J].中国科学:地球科学,2003,33(4):373-383.
[2]许志琴,蔡志慧,张泽明,等.喜马拉雅东构造结---南迦巴瓦构造及组构运动学[J].岩石学报,2008,24(7):33-46.
[3]王琪,张培震,马宗晋.中国大陆现今构造变形GPS观测数据与速度场[J].地学前缘,2002,9(2):415-429.
[4]CARRANZA-TORRES C,FAIRHURST C.Application of the Convergence-Confinement method of tunnel design to rock masses that satisfy the Hoek-Brown failure criterion[J].Tunnelling&Underground Space Technology Incorporating Trenchless Technology Research,2000,15(2):187-213.
[5]Shahidi A R.Analysis of longitudinal profile of the tunnels in the active faulted zone and designing the flexible lining(for KOOHRANG-III tunnel)[J].Tunnelling&Underground Space Technology Incorporating Trenchless Technology Research,2005,20(3):213-221.
[6]李科.穿越断层带隧道建设关键力学问题研究[D].上海:上海交通大学,2013.
[7]崔芳,高永涛,吴顺川.断层影响下隧道喷锚支护效果的数值模拟[J].金属矿山,2011,40(6):25-28.