摘要
为解决80704综放工作面支护难度大、支护费用高等问题,提出了一种锚杆支护方案。在分析顶板支护、巷帮支护的基础上,对采用该支护方案后的巷道矿压、锚杆锚索载荷结果进行观测和分析。分析结果表明,该支护方案有助于解决现阶段锚杆支护技术所遇到的困难,为矿井的安全、高效生产提供有力的技术支撑,并且该研究成果在80704综放工作面工业新试验中取得了良好的技术经济效果。
In order to solve the problems of difficult support and high support cost of the 80704 fully mechanized caving face, a bolt support scheme was proposed. On the basis of analyzing the roof support and the roadway side support, this paper observed and analyzed the results of the roadway mine pressure and anchor cable load after applying the support scheme. The analysis results show that the support scheme can help solve the difficulties encountered in the current stage of bolt support technology,provide strong technical support for the safe and efficient production of mines, and the research results have achieved good technical and economic effects in the new industrial test of 80704 fully mechanized caving face.
引文
[1]康红普,王金华.煤巷锚杆支护理论与成套技术[M].北京:煤炭工业出版社,2007.
[2]康红普,吴拥政,李建波.锚杆支护组合构件的力学性能与支护效果分析[J].煤炭学报2010,35(7):1057-1065.
[3]王飞虎.锚杆支护巷道快速掘进的施工方法和措施[J].煤矿支护,2007(2):24-27.
[4]颜立新.软煤层碎胀顶板高预应力短锚索支护技术[J].煤炭科学技术,2010(8):39-43.
[5]滕继超.孤岛工作面破碎顶板回采巷道锚网索支护技术应用实践[J].煤矿支护2010(21):403-405.