摘要
随着数据中心用电负荷的快速增加,10 kV柴油发电机组在新一代数据中心应用越来越普遍。如何选择双电源自动切换装置以及其系统的逻辑控制,显得至关重要。双电源自动切换在数据中心供电系统中是非常重要的组件,有着重要的作用。本文将阐述10 kV供电系统中双电源逐级投切应用和对负载进行管理,以使其供电系统的可靠性提高。
With the rapid development and increase of data center load,the application of IOkV diesel generator set in the new generation data center is becoming more and more popular.How to select dual power automatic switching device and the logical control of its system is very important.ATS is a very important component in the power supply system of data center and plays an important role.This paper will elaborate how to manage the system and load in order to improve the reliability of its power supply system and its application research.
引文