针对赵庄矿3#煤层水文地质条件复杂的情况,通过地质勘探,总结带压开采导水规律,确定该地段主要导水通道。阐述了相应的带压开采防治水技术措施:物探勘察、抽放水试验是防治水技术的前提和基础;根据相关规定计算需要留设隔水煤柱的合理宽度;注浆加固防止顶底板突水;为安全生产提供技术保障。
In view of the complicated hydrogeological conditions of 3# coal seam in Zhao Zhuang mine, we summarized the water conducting law of the mining under pressure and identified the main water conducting passageway through geological exploration. The corresponding measures for water prevention and control with pressure mining are described: geophysical prospecting and pumping test are the precondition and foundation for water prevention and control. According to the relevant regulations, the reasonable width of the coal pillar is calculated,grouting reinforcement prevents water inrush from the top and floor, and provides technical support for safe production.
引文
[1]刘树才,岳建华,刘志新.煤矿水文物探技术与应用[M]徐州:中国矿业人学出版社,2006.
[2]何继善.电法勘探的发展和展望[J].北京,地球物理学报,1997,40(增刊):308-316.
[3]殷金虎,贺子奇.地下工程注浆材料与注浆技术的研究应用现状[J].太原,建材技术与应用,2007,(9):13-15.
[4]黄存捍,冯涛,等.断层影响下底板隔水层的破坏机理研究[J].徐州,采矿与安全工程学报,2010,27(2):219-222,227.
[5]张国华,张雪峰,等.中厚煤层区段煤柱留设宽度理论确定[J].西安,西安科技大学学报,2009,9(5):521-526.