摘要
为提高超前探测的准确率,防止误揭隐伏断层,利用瑞利波超前探测技术,结合工作面超前钻探,对车集煤矿掘进工作面进行超前探测,用于预报工作面前方煤层赋存情况及地质构造。结果显示:采用2种探测技术所得结果基本吻合,经过相互验证,能够准确掌握工作面前方煤层赋存情况及地质构造。
In order to raise the accuracy of advanced detection for preventing exposing concealed faults,using detection technology of rayleigh wave combining with advance borehole drilling detected forecasted the condition of coal seam and geological structure in front of heading face. The results showed that the conclusion was basically consistent between rayleigh wave and advance borehole drilling. By mutually verified, can accurate control the condition of coal seam and geological structure in front of heading face.
引文
[1]董小石.煤矿深部开采可能出现的问题及对策[J].煤炭技术,2003,22(7):110.
[2]李胜,祁晓鑫,李军文.瑞利波技术超前探测掘进工作面构造异常[J].煤田地质与勘探,2015,43(1):96-99.
[3]董书宁.煤矿安全高效生产地质保障技术现状与展望[J].煤炭科学技术,2007,35(3):1-5.
[4]王军杰,王学民,樊孝敏,等.瑞利波探测实例与常见问题分析[J].煤炭技术,2014,33(4):89-91.
[5]丛皖平,张鹏,王继矿.多道瑞利波在矿井独头巷道超前探中的应用[J].煤田地质与勘探,2008,36(4):67-69.
[6]金明方,申青春,谢伟.钻探与物探相结合判断大中型断层属性研究[J].煤炭工程,2013,45(10):100-101,105.