水平岩层隧道超挖原因及合理超挖数量分析
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Analysis of the Overbreaking Reason and Reasonable Overbreaking Quantity in the Horizontal Rock Stratum Tunnel
  • 作者:王飞 ; 赵晓勇 ; 马宏韬
  • 英文作者:WANG Fei;ZHAO Xiao-yong;MA Hong-tao;China Railway First Survey and Design Institute Group Co.Ltd;
  • 关键词:水平岩层 ; 层状构造 ; 节理裂隙 ; 超挖回填 ; 现场写实 ; 数理统计
  • 英文关键词:horizontal rock stratum;;stratiform structure;;joint fissure;;overbreaking and backfill;;field realism;;mathematical statistics
  • 中文刊名:TDGC
  • 英文刊名:Journal of Railway Engineering Society
  • 机构:中铁第一勘察设计院集团有限公司;
  • 出版日期:2018-04-15
  • 出版单位:铁道工程学报
  • 年:2018
  • 期:v.35;No.235
  • 语种:中文;
  • 页:TDGC201804017
  • 页数:6
  • CN:04
  • ISSN:11-3567/U
  • 分类号:78-83
摘要
研究目的:蒙华铁路蒙陕段存在水平岩层,多为粉砂岩夹薄层泥岩,层状构造,层间结合差,节理裂隙发育。水平岩层段隧道施工时拱部水平节理岩隙处易发生掉块剥落,开挖找顶、排险作业后常表现为不规则矩形或平顶;仰拱开挖后基底清理时顺水平节理剥离,岩块脱落较严重,开挖轮廓墙脚"弧形位置"处超挖严重。现场实测超挖量远超规范允许值,导致隧道开挖、出渣运输及超挖回填等数量不同程度增加,因此有必要针对水平岩层段隧道超挖回填的合理数量进行分析研究。研究结论:(1)水平岩层隧道的超挖与爆破作业扰动、开挖应力释放、地下水影响、隧道不同部位、洞身围岩强度及施工方法等均有关;(2)结合大量现场写实与测量数据,采用数理统计分析方法,遵循实事求是原则,扣除施工误差影响,得到了隧道在Ⅱ~Ⅴ级围岩拱部/边墙/仰拱(底板)各部位、有水/无水工况条件下,更加贴近现场实际的、合理的超挖及回填数量;(3)本研究结果可为水平岩层条件下隧道设计、现场施工、验工计价等提供一定的借鉴和指导,也可为同类型地质条件下隧道施工定额的研究提供参考。
        Research purposes: The horizontal rock stratum of Inner Mongolia and Shaanxi paragraph of West Inner Mongolia-Central China Railway exists,most of which is siltstone clipping thin layer mudstone,with stratiform structure,poor interlayer bonding,and joint and fracture development. The block and spalling is easy to happen in the tunnel arch horizontal joint fissure under construction,often expressed as irregular rectangle and flat roof after excavation and excluding risk. The horizontal joint stripped when basilar cleaning after inverted arch excavation,rock mass shedding is more serious,the overbreaking in the tunnel wall arc position is serious. The excess excavation of field measurement is far beyond specification permissible value,which causes tunnel excavation,dregs transportation and overbreaking backfill quantity also increase in different degrees. It is necessary to analyze and research the reasonable quantity of horizontal rock stratum tunnel overbreaking and backfill.Research conclusions:( 1) The overbreaking of horizontal rock stratum tunnel is relate to the blasting operation disturbance,stress release of excavation,influence of groundwater,different parts of tunnel,strength of surrounding rock,construction methods and so on.( 2) Combining with a large number of field measured data,using mathematical statistics analysis method,following principle of seek truth from facts,deducting the influence of construction error,thefield practical and reasonable overbreaking and backfill quantity of arch,side wall and inverted arch is got under the conditions of various parts of Ⅱ ~ Ⅴ class surrounding rock tunnel with and without water.( 3) The research achievements could provide guidance for tunnel design,construction and inspection price,and provide reference for the research of tunnel construction quota under the similar geological conditions.
引文
[1]赵云恒,丰明海,程士俊,等.中国某特长隧道主要工程地质特征[J].铁道工程学报,1996(2):120-128.Zhao Yunheng,Feng Minghai,Cheng Shijun,etc.The Major Engineering Geology Features of Some Long Tunnel in China[J].Journal of Railway Engineering Society,1996(2):120-128.
    [2]王石春,陈光宗,何发亮.中国铁路隧道工程地质的发展[J].铁道工程学报,1996(2):48-54.Wang Shichun,Chen Guangzong,He Faliang.The Engineering Geology Development of China Railway Tunnel[J].Journal of Railway Engineering Society,1996(2):48-54.
    [3]李文广.铁路隧道软弱围岩水平岩层施工技术[J].铁道建筑技术,2011(11):18-21.Li Wenguang.The Horizontal Rock Stratum Construction Technique of Weak Surrounding Rock in Railway Tunnel[J].Railway Construction Technology,2011(11):18-21.
    [4]Q/CR 9604—2015,高速铁路隧道工程施工技术规程[S].Q/CR 9604—2015,Technical Specification for Construction of High Speed Railway Tunnel Engineering[S].
    [5]姬维天,刘洪震.水平层状岩体隧道爆破开挖数值模拟及振动效应研究[J].洛阳理工学院学报:自然科学版,2016(4):27-30.Ji Weitian,Liu Hongzhen.Numerical Simulation and Vibration Effect on Horizontal Layered Rock Mass Blasting Excavation[J].Journal of Luoyang Institute of Science and Technology(Natural Science Edition),2016(4):27-30.
    [6]殷立军.层状围岩隧道施工爆破数值模拟分析[J].现代隧道技术,2004(S3):276-279.Yin Lijun.The Construction Blasting Numerical Simulation Analysis of Layered Surrounding Rock Tunnel[J].Modern Tunnelling Technology,2004(S3):276-279.
    [7]关宝树.关于提高我国隧道设计施工技术水平的几个关键问题[J].铁道工程学报,2003(3):59-66.Guan Baoshu.Several Key Issues about Improving the Tunnel Design and Construction Technical Level in Our Country[J].Journal of Railway Engineering Society,2003(3):59-66.
    [8]TB 10003—2016,铁路隧道设计规范[S].TB 10003—2016,Code for Design of Railway Tunnel[S].